Projects

Caminada Headland Restoration

Client: Louisiana Department of Natural Resources

Date: 2010 – Ongoing

The Caminada Headlands shoreline has experienced some of the most rapid erosion  in the country.

Click the image below to view a time-lapse of the shoreline retreat.

The Caminada Headland Beach and Dune Restoration

Tags: Coastal, Ecosystem Restoration
View Details

Hideaway Beach Erosion Control Project

Client: City of Marco Island

Date: 2010 – 2013

Hideaway Beach is part of a dynamic morphologic area that has experienced drastic changes in recent decades. The interaction of riverine flows, tidal fluctuations, spit migration, and barrier island deterioration have increased the

Tags: Coastal, Environmental, Survey
View Details

FEMA Flood Zone Mapping

Client: Various

Date: 2010 – Ongoing

Coastal Engineering Consultants, Inc. (CEC) has provided professional services to a number of clients for flood zone remapping. CEC was responsible for preparation, submittal, and support of an application to the Federal Emergency Management Agency

Tags: Survey
View Details

The Quarry Waterfront Amenities

Client: Pulte

Date: 2005 – Ongoing

Since 2005, CEC has provided the developer with professional engineering, permitting and surveying services for the development of the waterfront amenities at the lakefront community, The Quarry in Naples, FL. These amenities include residential floating dock

Tags: Waterfront Design
View Details

Scofield Island Habitat Restoration

Client: Coastal Protection and Restoration Authority

Date: 2011 – Ongoing

A first in our nation’s history, the Scofield Island Restoration Project utilized sand dredged from the Mississippi River to restore the geomorphic and ecological form and function of this critical barrier island

Tags: Coastal, Ecosystem Restoration
View Details

South Marco Beach & Structure Restoration

Client: Collier County Coastal Zone Management

Date: 2010 –2013

Coastal Engineering Consultants (CEC) led the integrated consulting team to provide comprehensive services for the conceptual plan, design, permitting, bidding, and construction management of the third major renourishment cycle for South Marco Island. 

Tags: Coastal
View Details

Blind Pass Ecosystem Restoration

Client: Lee County Division of Natural Resources

Date: 2008 – Ongoing

Coastal Engineering Consultants (CEC) is providing comprehensive construction administration, environmental, and monitoring services for the Blind Pass Restoration Project. Approximately 150,000 cubic yards of material were removed in the initial maintenance

Tags: Coastal, Ecosystem Restoration
View Details

Estero Island Physical Monitoring Survey

Client: Lee County Department of Natural Resources

Date: 2013

Physical monitoring surveys are conducted to provide comprehensive analyses of changes in nearshore morphology and typically involve the merging of upland, wading and hydrographic data sets. Physical monitoring is particularly useful when conducted

Tags: Survey
View Details

Pirate Harbor Hard-bottom Monitoring

Client: Charlotte County BOCC

Date: 2013

While providing dredging permitting, design and construction management services for the deepening of the Pirate Harbor channel in Charlotte County, Coastal Engineering Consultants, Inc. was tasked to conduct a series of hard-bottom monitoring surveys and produce

Tags: Environmental, Survey
View Details

Terrebonne Basin Barrier Shoreline Restoration

Client: Louisiana Coastal Protection and Restoration Authority (CPRA)

Date: 2008 – Ongoing

The Louisiana Coastal Area Ecosystem Restoration Study has identified the Terrebonne Basin Barrier Shoreline Restoration project (TBBSR) as a near-term critical project to restore the natural ecological functions of the

Tags: Ecosystem Restoration
View Details

Mound House Observation Pier

Client: Town of Fort Myers Beach

Date: 2013 – Ongoing

Coastal Engineering Consultants, Inc. (CEC) is assisting the Town of Fort Myers Beach in the permitting, design and construction of a community observation pier located at Mound House, a sight of historic

Tags: Waterfront Design
View Details

Galveston ODMDS Sediment Testing & Analysis

Client: U.S. Environmental Protection Agency

Date: 2011 – Ongoing

Ocean Dredged Material Disposal Sites (ODMDS) are managed to ensure that the placement of dredged material within these areas does not unreasonably degrade the marine environment or interfere with other beneficial uses

Tags: Environmental
View Details

Charlotte County Erosion Control Project

Client: Charlotte County Public Works

Date: 2001 – Ongoing

Coastal Engineering Consultants (CEC) has served on an integrated consulting team providing comprehensive services for beach restoration and inlet management to Charlotte County since 2001. The services have included:

evaluating site conditions;
evaluating economical and

Tags: Coastal, Environmental
View Details

Port Everglades ODMDS Expansion

Client: US Army Corps of Engineers, Jacksonville District

Date: 2012

The Site Management and Monitoring Plan developed for the Port Everglades Harbor Ocean Dredged Materials Disposal Site (ODMDS) placed project volume restrictions of 500,000 cubic yards until capacity modeling was completed. In

Tags: Environmental
View Details

Horton Park Shoreline Protection

Client: City of Cape Coral

Date: 2006 – 2012

Horton Park is located at ICW Marker 60 on the Caloosahatchee River, just south of the Veterans Memorial Bridge and Four Mile Cove Ecological Preserve.  The shoreline at Horton Park along the Caloosahatchee

Tags: Coastal, Environmental, Waterfront Design
View Details

Lee County Waterways Surveys

Client: West Coast Inland Navigation District

Date: 2010 – Ongoing

WCIND contracted with Coastal Engineering Consultants, Inc. (CEC) to provide survey, geotechnical, and engineering services for fourteen (14) waterways in Lee County as part of the Southwest Florida Regional Waterways Management System

Tags: Survey
View Details

Blind Pass Seagrass Monitoring

Client: Lee County Division of Natural Resources

Date: 2008 – Ongoing

Blind Pass separates Sanibel Island from Captiva Island in Lee County, Florida. Over time, sand had accumulated in the tidal channel that connects Charlotte Harbor to the Gulf of Mexico and

Tags: Environmental, Survey
View Details

Blind River Freshwater Diversion

Client: CDM for Louisiana Coastal Protection and Restoration Authority (CPRA)

Date: 2010 – 2011

The objectives of the Blind River Freshwater Diversion project were to collect, siphon, convey, and distribute water from the Mississippi River to the wetland areas adjacent to the

Tags: Ecosystem Restoration, Survey
View Details

Admiralty Point Waterfront Assessment & Replacement

Client: Admiralty Point Condominium

Date: 2009 – 2010

Admiralty Point Condominium Association, an 11 acre, 166 unit development at Doctor’s Pass in Naples, Florida contracted Coastal Engineering Consultants, Inc. (CEC) in 2009 for the following services:

assist in the above and below

Tags: Waterfront Design
View Details

Bay Joe Wise Barrier Shoreline Restoration

Client: Coastal Protection and Restoration Authority (CPRA)

Date: 2003 – 2009

The Pass Chaland to Grand Bayou Pass Barrier Shoreline project is located on the Gulf shoreline in Plaquemines Parish, Barataria Basin, Louisiana. Wetland, beach, dune, and marsh habitats within the project

Tags: Coastal, Ecosystem Restoration
View Details
Back to Top